top of page
PBHOA Architectural Control Committee Improvement Plan Submittal Form

***Must be submitted a minimum of 5 days prior to project start date.***

If painting, provide exising color in desciption as well a proposed color and attach paint swtaches of everything that is changing.

If replacing roof, provide existing shingle type and color (if known) and proposed shingle in description. Ensure to attach samples.

Upload File
bottom of page